Tag Archives: centrifugal pump

GNMS-1500D Mud Recycling System Deliver to Clients in Asia

Normally, GN Solids Control recommends 4 stage separation systems for TBM or pipe jacking projects for a thorough treatment of drilling mud. In some cases, based on clients’ customized requests, GN Solids Control can also make 2 or 3 stages separation units in a compact design. For example, the GNMS-500D and GNMS-1000D are both quite popular products during the years. And recently, GN just delivered several sets of GNMS-1500D to some clients in Asia.

IMG_20220118_105415

1. GNMS-1500D Mud Recycling System is designed and manufactured according to the needs and requirements from customer, which is appropriate for mud treating & recycling in mining industry, piling works, HDD(horizontal directional drilling) and so on.

2. The treatment capacity of this system is up to 360m³/h. This system includes 2 stages of solids control and separation. The first-stage separation is the shale shaker part of double deck shale shaker & desander.

3. The second-stage separation is the desander part of shale shaker & desander fed by a large powered centrifugal pump. Centrifugal pump gives enough power to the desander cyclones and mud is separated into liquid and solids by centrifugal force inside the cyclones.

4. Inside the catch tank, there is a device to prevent dry-run of the centrifugal pump, for mud compensation and preparation.

Function of GNMS-1500D:

During drilling, the drilling mud contains lots of sand and silt. This recycled mud is transferred to GNMS-1500D’s inlet pipe and solids phase larger than 40μm are removed by the mud recycling system. In this way, clean drilling mud is returned to the rig/pipe jacking machine.

If you or your clients have similar projects, or if you or your clients need more information from GN professional team, welcome to consult from GN freely. GN Solids Control is located only 40 km from Beijing, the capital of China. And GN has branch companies in Houston, TX, USA and also in Moscow, Russia.

Drilling Rig Solids Control Equipment shippped to Oilfield Service Company

Solids Control systems and equipment are quite important for a successful drilling project. An efficient solids control system can helps to remove solids particles out of the drilling mud. In this way, the expensive drilling mud could be reused in future drilling. What is included in a complete solids control system?

2021.11.18 Shale Shaker

A complete solids control system, especially for a large power horse drilling rig, should have following equipment divided per tanks:

1. The trip tank. Per certain rig size, there should be a certain amount of drilling mud to be prepared, but during drilling, there is always some mud loss because of drilling or because of mud separation. So there should be a trip tank holding well prepared mud for compensate the mud loss. For the trip tank, there is always a mud agitator and a centrifugal pump as trip pump.

2. Settle tank or also called the shaker tank. Shale shakers are the first step separation of the solids control system, they are used to remove the most solids from the drilling mud with suitable vibrating G force and screen mesh. On a long shaker tank, after the shale shakers, there should be a degasser to remove the bubbles generated during drilling to ensure the safety and to protect the pumps in following steps. If there is a mud cleaner in this system, it should be on this tank, too. A mud cleaner is a combination of desanding cones and desilter cones fed by centrifugal pumps.

3. Active tank. It is a tank for decanter centrifuge. The decanter centrifuge is located after the mud cleaner, to do the barite recovery or fine particle separation. It is always fed by a submersible slurry pump or a screw pump

4. Suction tank for mixing and reserve tank for storage.

For more information, welcome to contact GN directly.